|
Project:
Project
Description: |
Upper Allegheny Joint Sanitary
Authority
Sewage
Treatment Plant
The
Upper Allegheny Joint Sanitary Authority serves approximately 10,000
customers in the communities of Tarentum, Borough of Brackenridge, Deer
Township, Fawn Twonship, and Harrison Township in Allegheny county.
As the engineer for the Upper Allegheny Joint Sanitary Authority,
Gibson-Thomas Engineering Co., Inc. is responsible for designing all
replacements or upgrades that maintain the 6.0 MGD sewage treatment
plant. We have recentl y
designed capital improvements for the plant which include the
following: digester wall rehabilitation, fuel storage tank removal,
replacement of plant and pumping station doors, communutor replacement,
replacement and upgrade of plant grit hopper, replacement of grit pumps
and collection system, replacement of compressors with smaller more
efficient models, replacement of deteriorated hand rails and grating,
replacement and upgrade of all combined system outfalls, replacement of
plant main pumps, renovation of parking lots and roadways, construction of
a new plant entrance gate with automatic controls, installation of new
drainage ditches on the plant grounds, and painting the interior and
exterior at the plant and pump station. Previous upgrades included
the modifications of the existing aeration system, digestor conversion
from anaerobic to aerobic, and numerous mechanical improvements.
|